The next show will be ACA (American Correctional Association) Booth Number: 333 Dates: July 30 – Aug 2
A large-scale maximum-security installation and one of the most referenced projects in the Harding portfolio. MicroComm DXL zero-call-blocking architecture, PLC integration, and fault-tolerant design in one of the most demanding institutional environments in the western United States.
CORRECTIONAL | Centro Federal de Readaptacion Social Num. 15 Chiapas, Mexico
Founded in 1969 by University of Alberta professors. ISO 9001 certified. Still building in Edmonton
Every project on this list started with a conversation. An engineer with a specification to write. A contractor with a facility to commission. A facility manager replacing a system that should have lasted longer. We answered the phone, worked through the requirements, and delivered.
If you are working on a project that needs the same standard of life safety infrastructure, that conversation starts the same way it always has.